Silver Creek Dam Break Analysis
Prepared by Philip Williams & Associates for the City of Silverton, 1/18/2000
Adobe Acrobat File Click to Download in the entire document in Adobe Acrobat Format, (4.6mb)

Purpose:

Figure 1This report documents procedures used and results achieved for a dam breach analysis of the Silver Creek Dam and Reservoir (Figure 1). Two breaching scenarios were modeled, over-topping during the 100-year storm event and a piping failure during normal operation. The results of this study will assist the City of Silverton in the possible development of an Emergency Action Plan.

Background:

Construction of the 65-foot-high, earth-filled dam across Silver Creek was completed in 1974. The dam has a crest length of 680 feet, including a 120-foot chute spillway. The dam and reservoir are located approximately 2 miles southeast of downtown Silverton. The dam is owned and operated by the City of Silverton for municipal water supply and recreation uses. Available construction drawings of the dam are included in Appendix A.

On March 25, 1993, a 5.6-magnitude earthquake occurred with an epicenter approximately 10 miles east of the City of Silverton (Appendix A). Following the earthquake, the City and its residents decided to create a city-wide Emergency Action Plan (EAP). The EAP is a guideline of actions put in place during specific emergency situations (e.g. earthquake, flood, fire, etc.) in order to minimize injuries and property damages. A dam break analysis of Silver Creek Dam and the resulting inundation of downstream properties may form an integral part of the EAP.

Dam Failure Scenarios:

Two different failure scenarios of Silver Creek Dam were modeled: piping and over-topping. Piping failure occurs if water migrates through the dam material and develops a passage. This could be due to inadequate compaction during construction of the dam, or to changes to dam integrity caused by seismic activity, slope failure or vegetation. As water flows (pipes) through the dam material, it continues to carry away more material and the passage grows in size. Eventually the size of the passage compromises the structural integrity of the dam and causes collapse of the structure itself.

Over-topping failure occurs when sustained reservoir inflow is greater than the combined spillway discharge and reservoir storage capacity. Eventually the water surface elevation in the reservoir rises above the dam crest, causing flow down the face. Flow over the downstream face of the dam causes erosion. Eventually, as with the piping scenario, the erosion compromises the structural integrity and a breach develops.

Model Development:

Two different computer models were used to estimate the inundation produced by the dam failure scenarios: BREACH and MIKE 11. BREACH is a public domain computer program developed by the National Weather Service (NWS). The BREACH model simulation is part of the Dalnbrk suite of programs and is based on the one-dimensional St. Venant equations of unsteady flow. Parameters describing the dam's physical characteristics (storage volume of the reservoir, materials, height, initial water surface elevation in the reservoir during the simulation) are used to estimate an outflow hydrograph created by catastrophic dam failure.

The MIKE II model is produced by the Danish Hydraulic Institute (DHI). MIKE II is a one dimensional unsteady flow computation model also implementing the St. Venant equations. The MIKE II model was used to estimate the water surface elevation and the time to peak as the flood hydrograph is routed downstream along Silver Creek.

The model NWS Dambrk was originally proposed for use on this study. It too is a one-dimensional model using the St. Venant equations. However, characteristics of the Silver Creek channel and floodplain require more computational stability than Dambrk could provide. Dambrk is limited to 200 total cross-sections (actual and interpolated) and nine iterations per time step. The relatively steep channel slope and high number of bridges proved too complex for this application. The Dambrk model for Silver Creek Dam would run to completion without bridges in the model. Once bridges were added, the model crashed due to "non-convergence" of the water surface profiles.

After consulting the Hydraulic Research Lab at the NWS for possible solutions to the "non-convergence" issue, PWA attempted to use Fldwav. The NWS updated Dambrk in the mid-1980's and created the program Fldwav. The model is basically identical to Dambrk except that it allows more total cross sections and more iterations per time step. As with Dainbrk, the model worked fine when no bridges were included. When the bridges were included in the model, the program would also crash for "non-convergence" reasons. For this reason the MIKE I I was used for floodplain routing.

BREACH: The input parameters required for BREACH include the materials used in the construction of the dam and characteristics of the dam itself. Table I summarizes the parameters used for this analysis. Values shown in Table I were taken from a Technical Memorandum entitled Seismic Stability Analysis, Silver Creek Dam, Silverton Oregon, prepared by Comforth Consultants, Inc., dated July 21, 1999.

The BREACH program requires the following physical characteristics; dimensions of the dam, spillway, and reservoir, and inflow and outflow from the reservoir. Table 2 contains the physical characteristics of Silver Creek Reservoir used for this analysis.

The water surface elevation (WSE) given in Table 2 for the piping breach reflects a "normal" operating elevation for the late summer months. The 30 cfs inflow into the reservoir is a "base-flow" for summer months (USGS gage 14200300) under normal operating conditions. The WSE in the over-topping scenario is taken just below the crest of the dam. The WSE is assumed to reach this elevation because of a debris blockage of the spillway. The over-topping inflow is equal to the 100-year flow rate as determined in the Phase I Inspection Report (June, 1981).

The breach elevations listed in Table 2 were estimated from the construction drawings. In our opinion, these elevations appear reasonable based on a site inspection of the dam itself. The overtopping breach elevation was set equal to the lowest elevation of the dam crest (439.4 ft.). Inspection of the downstream face of the dam revealed hydrophylic (water loving) plants along the lower left abutment. It was assumed that a small amount of seepage occurs at this site, so the piping breach was set for this elevation.

Using the BREACH modeling program and the physical dam characteristics noted above, breach dimensions and outflow hydrographs were estimated for each failure scenario. The results are summarized in Table 3, and the complete input/output for both models is provided in Appendix B.

The Time of Failure is the duration between the initial breaching and the time at which the breach is fully formed. The Time of Failure depends on the height of the dam, the type of material used in construction and the volume available in the reservoir. Typically, Times of Failure are longer for piping than for over-topping breaches. This is due to the slow erosion process associated with the upstream face during the very early phase of the piping breach. As the piping erosion proceeds, a larger and larger opening is formed which eventually causes a cave-in of the dam above the piping site. An overtopping breach formation is created after the downstream face of the structure has started to erode away due to flow over it. A crevasse forms that progresses into the dam material, weakening the dam itself until a completed breach forms.

MIKE II: The MIKE II model was used to estimate the peak WSE within Silver Creek in response to the discharge hydrograph produced by the dam failure. As the flood wave moves downstream, storage in the floodplain will attenuate the peak flow resulting in a decreased flow rate at the next downstream cross-section. MIKE II calculates the amount of attenuation created by the floodplain storage and also the time it takes for the floodwave to progress through the channel.

To properly model the progression of the floodwave, MIKE I I requires a physical description of the channel, floodplain, and all significant hydraulic structures (bridges/culverts). The channel description includes: channel geometry, bridge geometry, roughness coefficient (Manning's "n") and boundary conditions.

Cross-Sections: The locations of cross-sections to be used in the model were chosen based on the following criteria: changes in channel geometry (including floodplain), changes in channel slope, location of bridges, and points of interest. Thirty-one (31) cross-sections were developed for use in the MIKE II model.

The cross-sections are designated in river miles (RM) downstream from Silver Creek Dam. The cross sections start at the dam (RM 0.00) and extend downstream to RM 4.12 (downstream of the City's wastewater treatment plant). The cross-sections are described with station and elevation coordinates. Station 0+00 is on the left side of the channel when facing downstream. The station/elevation coordinates were developed using a topographic map provided by the City of Silverton. This topographic data was generated from aerial photogrammetry. The invert of the channel was estimated from aerial topography for the upper reaches of Silver Creek. In the reaches where the existing FEMA Flood Insurance Study (FIS) was available, the channel inverts were taken from the profile sheet in the FIS. We believe this provides more accurate information within the City Limits of Silverton.

Bridges: Eleven bridges are located between Silver Creek Dam and the downstream study limit, the Wastewater Treatment Plant (WWTP). Two bridges are small pedestrian bridges and five are privately owned bridges providing property access to the west bank of the creek. The remaining four bridges are larger structures owned by either the City of Silverton, Marion County, or the railroad. Of the eleven bridges, eight hydraulic structures (bridges) were included in the MIKE II model. The two pedestrian bridges were not modeled, because it is believed that they would fall immediately upon contact with the floodwave, therefore not impeding the progression of the floodwave. The "C" Street Bridge and the railroad bridge were combined and modeled as one hydraulic structure. Limited data was available for the railroad bridge, and since the railroad bridge and the "C" Street Bridge are adjacent to each other, the lower chord and higher deck elevations of the two bridges were used to create one hydraulic structure in the MIKE II model.

The bridges were modeled using cross-sections. Station and elevation coordinates were used to describe the top of deck, low chord and the bridge opening geometry. This methodology allows for pressure flow and weir flow calculations when the bridge is over-topped.

Boundary Conditions: The MIKE II model requires upstream and downstream boundary conditions. The upstream boundary condition is the inflow hydrograph, the characteristics of which were provided by BREACH for each of the failure scenarios noted above. Table 3 contains the peak discharges for each of the failure scenarios used in this study.

Figure 2At river mile 4.12, the downstream boundary of this study, a rating curve was developed for the cross section (Figure 2). The rating curve was developed from the MIKE II program based on cross sectional geometry, channel slope and the roughness coefficient. Manning's "n " - The roughness coefficients used in the MIKE II model were based on the values established in the existing FEMA Flood Insurance Study (FIS). The FIS uses a channel roughness coefficient ranging from 0.035 to 0.050 and an overbank range of 0.05 to 0. 140. Using these values as initial parameters in MIKE 11, steady-state models were run for comparison of the WSE.

Based on the steady-state computer runs, the Manning's coefficient was adjusted until the water surface elevations produced by the MIKE II model were relatively close to the results in the FIS. Table 4 contains the results of the model comparisons.

The range for Manning's number used in the MIKE II model is 0.04 to 0.05 in the channel and 0. 10 to 0. 11 in overbank and floodplain areas. The presence of structures within the floodplain was compensated for in the hydraulic model by increasing the Manning's "n" value.

Results:

Modeling: The BREACH and MIKE II models together provide estimates of both failure scenarios. Tables 5a and 5b summarize the results. Both tables contain the peak water surface elevation at each cross-section along with the time it takes the floodwave crest to reach that point. Time is referenced to the peak outflow from the failed dam. Also included in the tables are the peak flow rates associated with the water surface elevations. The peak flow rate decreases as the floodwave moves downstream due to attenuation of flow in the floodplain. Under both failure scenarios, the peak flow is attenuated more than 50 percent from cross-section 0.00 to cross-section 4.12. The model results also indicate that the floodwave will progress through the study area in approximately one hour. This time frame is from the time of breach to the beginning of the recession limb of the floodwave hydrograph at cross-section 4.12. Therefore, the average wave speed through the 4.12-mile study area is approximately 6 fps (feet per second).

Mapping: The water surface elevation generated for the two failure scenarios was used to produce the inundation areas displayed in Figures 3a and 3b. From the figures, it is apparent that significantly more creek valley is inundated as a result of the over-topping failure (Figure 3a). Under the piping failure (Figure 3b), the smaller flows are mostly contained with the channel near the main city development. The WSE is between 10 to 13 feet higher under the over-topping scenario.

Table 6 summarizes the flood depth at particular areas of interest within the study limits. The existing ground elevations are taken from the aerial topography, and the WSE is estimated from the results generated during this study.

Under both failure scenarios, an area of particular interest is in the vicinity of the high school. The water surface elevation in this area is above the existing topography. In this case, flow from Silver Creek may actually leave the Silver Creek watershed and discharge into one of the smaller tributaries of the Pudding River. If this occurs, the peak water surface elevations and flow rates for areas downstream of the high school may be lower. An evaluation of the flow split between the Pudding River tributary and lower study reach of Silver Creek is beyond the scope of this contract.

The modeling results presented in Tables 7a and 7b are the estimated out-of-bank duration along Silver Creek. These values are important because they forecast how long after the breach before emergency vehicles can enter the area.

The times shown in Tables 7a and 7b are for whenever flow is out of banks. The top of bank elevation was taken from the aerial topographic map provided by the City of Silverton. The number of structures involved when flow leaves the bank varies within the study reach. Even when the creek is out of bank, no structures may be involved. In the upper reach of Silver Creek, very few structures are affected until flow crests over S. Water Street. In the lower reaches, below Peach Street, the floodplain for Silver Creek basically starts at the top of bank, so more structures are affected as soon as flow reaches above top of bank.

The durations for Table 7b reveal some areas with flow out of bank 21 hours after the breach. This is because the breach is assumed to coincide with the 100-year storm event. Flooding will occur within the lower reach of Silver Creek due to precipitation runoff as well. The extent of the 100-year floodplain below "C" Street is quite significant.

The effects on the calculated water surface profile created by the modeled bridges are minor. The MIKE II model assumes that the bridges are permanent structures that will remain in place during the breach event. Table 8 summarizes the bridge data included in the MIKE II model, along with the approximate surface elevation for each breach scenario. The model neglects the effect of debris bulking or jams created by possible bridge failure. For this reason, the actual effects of the bridges may be underestimated. Due to the high floodwave velocities and the depth of water over the bridges, it is assumed that the smaller private bridges will be washed out. If this occurs, the debris from the bridges and from the dam itself may collect on the upstream face of the larger bridges, creating a debris jam. This extra lateral pressure from the jam may cause additional failures as well. Due to the low percentage of flow in Silver Creek compared to the amount of flow in the overbank area, debris bulking may have little effect on the peak water surface elevation. As flow recedes, any debris jams will cause localized backwater flooding.

Figure 3a
Figure 3bConclusions and Recommendations:

The results of any breach of Silver Creek Dam would be catastrophic for the City of Silverton. As illustrated in the inundation maps, significant portions of the valley are estimated to be under water during an over-topping failure (Figure 3a). The inundation area for a piping failure (Figure 3b), affects far fewer structures and does not extend into the city center as much as the over-topping breach. The major issue associated With a possible failure of Silver Creek Dam is the potential for loss of life. The total elapsed time from dam failure to the passage of the floodwave is less than one hour. This creates a challenge for alerting residents of the impending danger and initiating an evacuation plan.

To ensure proper advanced warning of a possible dam breach, the City of Silverton should install and maintain an early warning system at the dam. This system should be tied to water level monitors in the reservoir and on the downstream face of the dam. An example of a possible alarm scenario would be a rapid rise in the water surface elevation within the reservoir. This Could coincide with a maximum water surface alarm. If the water surface elevation in the reservoir rises rapidly or is above a predetermined elevation, an alarm would sound. Both of these alarm scenarios indicate a situation where inflow into the reservoir is greater than the storage and spillway capacity. This situation could lead to an overtopping breach of the dam.

The monitoring system for a possible piping failure may consist of collecting and measuring the flow volume at the downstream toe of the dam. If a set increase in flow is surpassed, an alarm would sound. The response to any of the alarms should be an immediate visual inspection and verification of the situation at the dam. The proximity of the dam to the City of Silverton and the good condition of the existing roads make visual inspection possible under most conditions. For a possible piping failure, the initial visual inspection of the downstream face may not locate the area of piping. Continued visual monitoring may be required until either the piping is located or the flow monitor indicates normal readings.

An Emergency Action Plan (EAP) can be developed that would direct actions following the activation of an alarm at Silver Creek Dam. The EAP could include a "Phone Tree" for emergency contacts, an easy to-follow flow chart of actions to take for each alarm scenario, public notification of the situation, evacuation plans, and evacuation centers. An EAP developed for the failure of Silver Creek Dam can be incorporated into any existing action plans the City may have already developed.